Tag Archives: Zumwalt

Navy Planning on Not Buying More LRLAP Rounds for Zumwalt Class

Navy Planning on Not Buying More LRLAP Rounds for Zumwalt Class

A 2009 Lockheed Martin oil painting of a Long Range Land Attack Projectile Strike from a Zumwalt by artisit Richard Thompson. Lockheed Martin Image Used With Permission

A 2009 Lockheed Martin oil painting of a Long Range Land Attack Projectile Strike from a Zumwalt by artisit Richard Thompson. Lockheed Martin Image Used With Permission

The Navy isn’t planning on buying the rocket assisted guided round designed for a key system in the Zumwalt-class of guided missile destroyer, a defense official confirmed to USNI News. Read More

Repaired Zumwalt Leaves Early for Baltimore Commissioning

Repaired Zumwalt Leaves Early for Baltimore Commissioning

Zumwalt (DDG 1000) arrives at Naval Station Newport, Rhode Island during its maiden voyage from Bath Iron Works Shipyard in Bath, Maine on Sept. 8, 2016. US Navy Photo

Zumwalt (DDG 1000) arrives at Naval Station Newport, Rhode Island during its maiden voyage from Bath Iron Works Shipyard in Bath, Maine on Sept. 8, 2016. US Navy Photo

The first in a trio of guided missile destroyer will arrive in Baltimore today ahead of a commissioning ceremony this week, service officials told USNI News. Read More

Next-Generation Destroyer Zumwalt Sidelined for Repairs After Engineering Casualty

Next-Generation Destroyer Zumwalt Sidelined for Repairs After Engineering Casualty

Guided-missile destroyer Zumwalt (DDG-1000) arrives at Naval Station Newport on Sept. 8, 2016. US Navy Photo

Guided-missile destroyer Zumwalt (DDG-1000) arrives at Naval Station Newport on Sept. 8, 2016. US Navy Photo

This post has been updated to correct the spelling of the second Zumwalt class guided missile destroyer. The correct spelling is Michael Monsoor (DDG-1001). 

Less than a month ahead of its commissioning, the Navy’s next-generation destroyer Zumwalt (DDG-1000) suffered an engineering casualty that could take up to two weeks to repair, Navy officials confirmed to USNI News on Tuesday. Read More

Zumwalt Destroyer Departs Bath Iron Works for San Diego Homeport

Zumwalt Destroyer Departs Bath Iron Works for San Diego Homeport

Zumwalt on Sept. 7, 2016. BIW Photo

Zumwalt on Sept. 7, 2016. BIW Photo

This post has been updated to correct the spelling of the second Zumwalt class guided missile destroyer. The correct spelling is Michael Monsoor (DDG-1001). 

The first in a class of new guided missile destroyer has left its Maine shipyard to start a three-month journey to its homeport in San Diego, Calif. Read More

Next Generation Destroyer Zumwalt Delivers

Next Generation Destroyer Zumwalt Delivers

Destroyer Zumwalt (DDG-1000) transits the Atlantic Ocean during acceptance trials with the Navy's Board of Inspection and Survey (INSURV). US Navy Photo

Destroyer Zumwalt (DDG-1000) transits the Atlantic Ocean during acceptance trials with the Navy’s Board of Inspection and Survey (INSURV). US Navy Photo

General Dynamics Bath Iron Works delivered the first Zumwalt-class guided missile destroyer to the Navy on Friday, Naval Sea Systems Command announced. Read More

Zumwalt Departs Bath Iron Works for U.S. Navy Acceptance Trials

Zumwalt Departs Bath Iron Works for U.S. Navy Acceptance Trials

The guided- missile destroyer Zumwalt (DDG-1000) departs the Bath Iron Works shipyard on March 24, 2016. US Navy Photo

The guided- missile destroyer Zumwalt (DDG-1000) departs the Bath Iron Works shipyard on March 24, 2016. US Navy Photo

The guided missile destroyer Zumwalt (DDG-1000) left the General Dynamics Bath Iron Works shipyard for its acceptance trials ahead of delivery to the U.S. Navy, the service announced on Wednesday. Read More

Navy Requires $450 Million More to Complete Zumwalt-Class Due to Shipyard Performance

Navy Requires $450 Million More to Complete Zumwalt-Class Due to Shipyard Performance

Z004-DDG10001310-_I6Z7919-11

DDG-1000 under construction in 2013. US Navy Photo via General Dynamics Bath Iron Works

The procurement cost of the three-ship destroyer Zumwalt-class (DDG-1000) has increased by $449.5 million since last years largely shipyard performance issues in the construction of the ships at General Dynamics Bath Iron Works, several Navy and congressional sources told USNI News. Read More