Tag Archives: Newport News Shipbuilding

NAVSEA Looking for Early Wins as it Kicks Off 20-Year Yard Modernization

NAVSEA Looking for Early Wins as it Kicks Off 20-Year Yard Modernization

Puget Sound Naval Shipyard (PSNS) and Intermediate Maintenance Facility (IMF) personnel bring the aircraft carrier USS Nimitz (CVN 68) into Drydock 6 at PSNS in Bremerton, Wash. PSNS and IMF personnel will work side by side with ship’s force teams to get the ship back in fighting condition and back to the Fleet. US Navy photo.

This post has been updated to include the redacted executive summary of NAVSEA’s shipyard optimization plan.

WASHINGTON NAVY YARD – The Navy plans to build momentum for its 20-year, $21-billion ship repair yard modernization plan through key early wins: proving that a redesign of the yard in Maine translates to a substantial increase in productivity, and renovating drydocks to accommodate the Navy’s newest nuclear-powered submarines and aircraft carriers. Read More

Navy Use of Laser Scanning Already Showing Big Savings; Summit This Month to Refine Plans

Navy Use of Laser Scanning Already Showing Big Savings; Summit This Month to Refine Plans

Lt. Clay Greunke, assigned to Space and Naval Warfare Systems Command (SPAWAR), demonstrates three-dimensional scanning and virtual reality by walking through processed scanned data from the guided-missile destroyer USS Truxtun (DDG 103) [on right] compared to two-dimensional drawings of the ship [on left], on May 26, 2017. The SPAWAR 3D scanning team recently received the 2016 Secretary of the Navy’s innovation award in the category of automated process development for their development of virtual and augmented reality during an official ceremony on June 5, 2017. US Navy photo illustration.

A $50,000 investment in laser scanning equipment saved the Navy nearly $2 million during the planning effort for USS George Washington‘s (CVN-73) refueling and complex overhaul. A small team of engineers with a LIDAR system did the work of the usual 20-person team, inspecting the nooks and crannies of the carrier to inform the overhaul plans.

Read More

Attack Sub Maintenance at Private Yards Running Behind; NAVSEA Hopes to See Timely Delivery if More Work Given to Them

Attack Sub Maintenance at Private Yards Running Behind; NAVSEA Hopes to See Timely Delivery if More Work Given to Them

USS Greeneville (SSN-772) sits atop blocks in Dry Dock #1 at the Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility, Pearl Harbor, Hawaii, on Feb. 21, 2001. The Los Angeles class attack submarine is dry-docked to assess the damage and perform necessary repairs following a Feb. 9 collision at sea with the Japanese fishing vessel Ehime Maru off the coast of Honolulu, Hawaii. DoD Photo

CAPITOL HILL – Two attack submarines sent to private shipyards for routine maintenance availabilities are running a few months behind schedule. But the Navy hopes that using these new-construction yards for sub-maintenance on a regular basis will help them become reliable providers of on-time maintenance. Read More