Tag Archives: Ingalls Shipbuilding

Second Arleigh Burke Restart Destroyer Rafael Peralta to Commission on Saturday

Second Arleigh Burke Restart Destroyer Rafael Peralta to Commission on Saturday

Rafael Peralta (DDG-115) sets sail for the first time to conduct initial at-sea builder’s trials off the coast of Maine in 2016. US Navy Photo

A previous version of this post mislabeled the iteration of the Aegis combat system on Peralta. It will field Baseline 9D, not Baseline 9C.

Guided-missile destroyer Rafael Peralta (DDG-115) will formally join the Navy fleet following a commissioning ceremony on Saturday. Read More

House Armed Services Committee Debates Hypoxia, LCS Buys, CVN-78 Shock Trials, Flight III Upgrade Schedule

House Armed Services Committee Debates Hypoxia, LCS Buys, CVN-78 Shock Trials, Flight III Upgrade Schedule

The House Armed Services Committee passed its annual defense bill on Thursday after a 14-hour markup, sending the bill to the full House of Representatives with no major changes to its recommended procurement profile.

Though few amendments that passed directly affect Navy and Marine Corps programs, several that failed or were withdrawn sparked serious debates about how the Navy ought to address pressing issues of the day: hypoxia concerns in the Navy’s fighter fleet, how to transition from the Littoral Combat Ship, industry’s ability to upgrade to the Flight III guided-missile destroyer design and more. Read More

Timing Of Destroyer, Attack Submarine Design Upgrades Creates Congressional Concern

Timing Of Destroyer, Attack Submarine Design Upgrades Creates Congressional Concern

An artist’s conception of a Raytheon’s SPY-6 radar on a Flight III Arleigh Burke destroyer . Raytheon Image

The Navy wants to buy guided-missile destroyers and attack submarines in bulk but has plans to upgrade the designs of both after the purchase, causing some concern among lawmakers that the design changes could hurt the programs’ stable cost and schedule. Read More

Navy Planning Public Shipyard Overhauls To Boost Efficiency, Replacing Aging Drydocks

Navy Planning Public Shipyard Overhauls To Boost Efficiency, Replacing Aging Drydocks

Aircraft carrier USS Harry S. Truman (CVN 75) transits the Elizabeth river from its homeport at Naval Station Norfolk to Norfolk Naval Shipyard in August 2016. US Navy photo.

The Navy is planning a multi-billion-dollar shipyard upgrade effort to help its four yards that maintain submarines and aircraft carriers do so more efficiently and accommodate the newest ships coming into the fleet. Read More

Despite No Mention of LPD-29 In 2018 Budget Request, Navy Committed to Rapid LPD-to-LX(R) Transition

Despite No Mention of LPD-29 In 2018 Budget Request, Navy Committed to Rapid LPD-to-LX(R) Transition

The amphibious transport dock Arlington (LPD 24) returned from successful U.S. Navy acceptance sea trials in November 2012. The ship had an opportunity to steam in formation with Anchorage (LPD 23) while at sea. Huntington Ingalls Industries photo.

WASHINGTON, D.C. – After this week’s 2018 budget request rollout it is still unclear if the Navy will use the $1.8 billion it was given recently to buy a 13th San Antonio-class amphibious transport dock ship (LPD-17) or if it will move straight to the next-generation LX(R) dock landing ship. But Navy leadership assures it is committed to keeping the transition from the LPD to the LX(R) derivative on track.
Read More

Huntington Ingalls Awaiting Commitment from Navy Before Ramping Up Workforce

Huntington Ingalls Awaiting Commitment from Navy Before Ramping Up Workforce

Newport News Shipbuilding placed a 900-ton superlift into dry dock, continuing construction of the nuclear-powered aircraft carrier John F. Kennedy (CVN 79). Nearly 90 lifts have been placed in the dock and joined together since the ship’s keel was laid in August 2015. Newport News Shipbuilding photo.

Newport News Shipbuilding placed a 900-ton superlift into dry dock, continuing construction of the nuclear-powered aircraft carrier John F. Kennedy (CVN 79). Nearly 90 lifts have been placed in the dock and joined together since the ship’s keel was laid in August 2015. Newport News Shipbuilding photo.

SAN DIEGO, Calif. – The Navy and many lawmakers want a massive increase in Navy spending but haven’t yet put forward a plan to start ramping up spending – and one shipbuilding executive said he wouldn’t feel comfortable investing in a larger workforce until certain signs of Navy commitment appear in the budget. Read More