Tag Archives: Naval Sustainment System – Aviation

Navy Looking to Accelerate Effort to Revitalize Public Shipyards Amid Lawmaker Concerns

Navy Looking to Accelerate Effort to Revitalize Public Shipyards Amid Lawmaker Concerns

The portside anchor of the aircraft carrier USS George H.W. Bush (CVN-77) is lowered into a dry dock for maintenance. GHWB is currently in Norfolk Naval Shipyard, Va. US Navy Photo

The Navy is evaluating how it can speed up the timeline for its initiative to renovate aging public shipyards amid concern from lawmakers that the current 20-year timeframe is too long. Read More

GAO Report on Navy Maintenance Delays

GAO Report on Navy Maintenance Delays

The following is the Oct. 29, 2020 Government Accountability Office report, Navy Maintenace: Navy Report Did Not Fully Address Causes of Delays or Results-Oriented Elements. Read More

NAVSEA: Analysis of Ship Repair Processes Led to Better On-Time Rates, More Realistic Schedules

NAVSEA: Analysis of Ship Repair Processes Led to Better On-Time Rates, More Realistic Schedules

BAE Systems has received $170.7 million in contracts from the U.S. Navy to perform simultaneous maintenance and repair on two Arleigh Burke-class (DDG 51) guided-missile destroyers in its San Diego shipyard. Under the awarded contracts, the shipyard will tandem dry-dock the USS Stethem (DDG 63) and USS Decatur (DDG 73) in October. The synchronized two-ship docking will be a first for the company’s newest dry-dock in San Diego. The contracts include options that, if exercised, would bring the cumulative value to $185 million. BAE Systems photo

The chief of naval operations in January threw down an aggressive goal for surface ship maintenance: zero days lost to maintenance delays by the end of Fiscal Year 2021. Read More