Tag Archives: CBARS

DoN $180B Budget Request Emphasizes Readiness; Reduces Spending on Ships, Aircraft

DoN $180B Budget Request Emphasizes Readiness; Reduces Spending on Ships, Aircraft

A sailor welds during the ongoing maintinance availability for carrier USS Dwight D. Eisenhower (CVN-69) on June 26, 2014. US Navy Photo

This post has been updated following Pentagon and Navy press briefings on the FY 2018 budget.

THE PENTAGON – The Department of the Navy’s $180-billion budget request sets out to improve overall readiness of the Navy and the Marine Corps while making only modest asks for new aircraft and ships. Read More

Navy, Industry Looking for Design ‘Sweet Spot’ for MQ-25A Stingray

Navy, Industry Looking for Design ‘Sweet Spot’ for MQ-25A Stingray

X-47B Salty Dog 501 flies over USS Theodore Roosevelt on Aug. 17, 2014. US Naval Institute Photo

X-47B Salty Dog 501 flies over USS Theodore Roosevelt on Aug. 17, 2014. US Naval Institute Photo

WASHINGTON, D.C. — Striking the balance between a tanker and a surveillance aircraft is an area of concern for Navy aviation planners and industry as they craft what will be the service’s first operational, carrier unmanned aerial vehicle, commander of Naval Air Forces said on Thursday. Read More

UPDATED: HASC Proposes $20.6B In Shipbuilding, 4-Year Carrier Builds, Possible LPD-29

UPDATED: HASC Proposes $20.6B In Shipbuilding, 4-Year Carrier Builds, Possible LPD-29

Aircraft carrier Gerald R. Ford (CVN-78) sits pier side in the erly morning light at Newport News Shipbuilding in 2014. US Navy Photo

Aircraft carrier Gerald R. Ford (CVN-78) sits pier side in the early morning light at Newport News Shipbuilding in 2014. US Navy Photo

The House Armed Services authorizes $20.6 billion in spending for Navy shipbuilding programs, prohibits the inactivation of cruisers as part of the Navy’s proposed phased modernization plan, and calls for the Navy to build aircraft carriers in four-year periods instead of five, according to its version of the Fiscal Year 2017 National Defense Authorization Act, released today. Read More

Skunk Works Head: Navy Should Consider A Flying Wing Design for MQ-XX Stingray

Skunk Works Head: Navy Should Consider A Flying Wing Design for MQ-XX Stingray

An artist's concept of a proposed unmanned carrier vehicle design. Lockheed Martin Image

An artist’s concept of a proposed unmanned carrier vehicle design. Lockheed Martin Image

ARLINGTON, Va. — To meet the Navy’s new set of requirements for its unmanned MQ-XX Stingray carrier tanker, the service should consider a design that could expand into a stealthy, high-end strike platform, the head of Lockheed Martin Skunk Works told reporters on Tuesday. Read More

WEST: NAVAIR’s Unmanned Aerial Tanker Acquisition Will Be Leaner Than Previous UCLASS Effort

WEST: NAVAIR’s Unmanned Aerial Tanker Acquisition Will Be Leaner Than Previous UCLASS Effort

X-47B conducts its first night flight April 10 over Naval Air Station Patuxent River, Md. on April, 10 2014. US Navy Photo

X-47B conducts its first night flight April 10 over Naval Air Station Patuxent River, Md. on April, 10 2014. US Navy Photo

SAN DIEGO — The head of Naval Air Systems Command said the effort to build the Navy’s first unmanned aerial vehicle to operate with the carrier air wing would be a leaner process than what was planned for the Navy’s Unmanned Carrier Launched Airborne Surveillance and Strike (UCLASS) program. Read More