Tag Archives: LCS-1

Littoral Combat Ship Sailors to Take on Greater Maintenance Responsibilities, As Navy Looks to Reduce Overall Class Maintenance Needs

Littoral Combat Ship Sailors to Take on Greater Maintenance Responsibilities, As Navy Looks to Reduce Overall Class Maintenance Needs

Hull Maintenance Technician 1st Class James Strotler welds a flow meter, a critical part to support the ship’s capability to produce potable water, for the reverse osmosis unit aboard USS Fort Worth (LCS-3). US Navy Photo

This article is the third in a three-part series on the changes occurring in the Littoral Combat Ship community as the fleet rapidly grows, moves to a new crewing and organizational construct and prepares for multi-ship forward operations. 

SAN DIEGO – The Littoral Combat Ship community is taking steps to both decrease the amount of overall maintenance work the ships require and increase the percentage conducted by sailors instead of contractors, several officers told USNI News during a recent visit to the San Diego waterfront. Read More

USS Freedom Crew CO Relieved Of Duty After Investigation Into Engine Damage

USS Freedom Crew CO Relieved Of Duty After Investigation Into Engine Damage

The littoral combat ship USS Freedom (LCS 1) transits the Pacific Ocean after departing Naval Base San Diego July 9, to participate in the Rim of the Pacific 2016 exercise. The engineering casualty that led to the engine damage happened this day, during transit from San Diego to Hawaii for the Rim of the Pacific exercise. US Navy photo.

The littoral combat ship USS Freedom (LCS 1) transits the Pacific Ocean on July 11 after departing Naval Base San Diego July 9, to participate in the Rim of the Pacific 2016 exercise. The engineering casualty that led to engine damage occurred on this date, while the ship was in transit to prepare for the international exercise. US Navy photo.

The commanding officer of Littoral Combat Ship USS Freedom (LCS-1) was relieved of his duties this week following an investigation into an incident that damaged the ship’s diesel engine in July, the Navy announced today. Read More

Navy to Demo Harpoon Missile on LCS at RIMPAC; NSM on USS Freedom by Next Deployment

Navy to Demo Harpoon Missile on LCS at RIMPAC; NSM on USS Freedom by Next Deployment

A Kongsberg Naval Strike Missile (NSM) is launched from the littoral combat ship USS Coronado (LCS 4) during missile testing operations off the coast of Southern California in September 2014. US Navy photo.

A Kongsberg Naval Strike Missile (NSM) is launched from the littoral combat ship USS Coronado (LCS 4) during missile testing operations off the coast of Southern California in September 2014. US Navy photo.

This post has been updated to include additional information from Naval Sea Systems Command.

The Littoral Combat Ship program is poised to make big strides this year in its strike capability, both with over-the-horizon missiles and the shorter-range Longbow Hellfire missile. Read More

LCS-4 Deployment Will Evaluate Ship Capabilities Ahead of 2018 Frigate Downselect

LCS-4 Deployment Will Evaluate Ship Capabilities Ahead of 2018 Frigate Downselect

Sailors assigned to Surface Warfare Mission Package Detachment 2 prepare to be hoisted out of the water by the littoral combat ship USS Coronado's (LCS 4) twin-boom-extensible crane following a visit, board, search and seizure training exercise on Aug. 15, 2015. US Navy photo.

Sailors assigned to Surface Warfare Mission Package Detachment 2 prepare to be hoisted out of the water by USS Coronado’s (LCS-4) twin-boom-extensible crane following a visit, board, search and seizure training exercise on Aug. 15, 2015. US Navy photo.

WASHINGTON NAVY YARD – As the Navy shifts from a two-variant frigate acquisition plan to a competition between the two Littoral Combat Ship builders, getting USS Coronado (LCS-4) out on its first deployment ahead of the frigate downselect will go a long way in validating the ship’s advertised capabilities, the Program Executive Officer for Littoral Combat Ships told USNI News. Read More

Document: GAO Report on USS Freedom Deployment

Document: GAO Report on USS Freedom Deployment

USS Freedom (LCS-1) underway in August 2013. US Navy Photo

USS Freedom (LCS-1) underway in August 2013. US Navy Photo

The following is a the Government Accountability Office report, Deployment of USS Freedom Revealed Risks in Implementing Operational Concepts and Uncertain Costs. The report was released on July 8, 2014. Read More