Tag Archives: HII

Keel Laid For Amphibious Warship Tripoli

Keel Laid For Amphibious Warship Tripoli

By:
Secretary of the Navy (SECNAV) Ray Mabus delivers remarks during the keel-laying ceremony for the amphibious assault ship Tripoli (LHA-7). US Navy Photo

Secretary of the Navy (SECNAV) Ray Mabus delivers remarks during the keel-laying ceremony for the amphibious assault ship Tripoli (LHA-7). US Navy Photo

The keel for the next-generation amphibious warship Tripoli (LHA-7) was laid in a ceremony at Ingalls Shipbuilding in Pascagoula, Miss. on Friday. Read More

NAVSEA: Affordability Prompted Second Look at LX(R)

NAVSEA: Affordability Prompted Second Look at LX(R)

By:
USS New York (LPD-21) in 2012. US Navy Photo

USS New York (LPD-21) in 2012. US Navy Photo

The Navy’s second look at the requirements and design of its next amphibious warship is walking the line between capability and affordability, the head of Naval Sea Systems Command told reporters Thursday at NAVSEA’s temporary headquarters. Read More

U.S. Navy Awards ‘Largest Shipbuilding Contract’ in Service History

U.S. Navy Awards ‘Largest Shipbuilding Contract’ in Service History

By:
USS Mississippi (SSN-782) conducts alpha trials in the Atlantic Ocean in 2012. US Navy Photo

USS Mississippi (SSN-782) conducts alpha trials in the Atlantic Ocean in 2012. US Navy Photo

U.S. Naval Sea Systems Command awarded a $17.8 billion contract for ten Block IV Virginia-class attack submarines (SSN-774) to prime contractor General Dynamic Electric Boat in the largest single shipbuilding contract in the service’s history, NAVSEA said on Monday in a late afternoon statement. Read More

Twenty Former Marine Generals Want More Money for Amphibs

Twenty Former Marine Generals Want More Money for Amphibs

By:
USS Makin Island (LHD-8), alongside the dock landing ship USS Comstock (LSD-45), right, and the amphibious transport dock ship USS San Diego (LPD-22) on March 14, 2014. US Navy Photo

USS Makin Island (LHD-8), alongside the dock landing ship USS Comstock (LSD-45), right, and the amphibious transport dock ship USS San Diego (LPD-22) on March 14, 2014. US Navy Photo

A constellation of twenty former U.S. Marine Corps generals — including a former commandant —wrote Congress to “highlight concerns,” on the health of the U.S. Navy’s amphibious forces and are throwing their support behind extending the San Antonio-class (LPD-17) amphibious warship hull form beyond the Navy’s current plan of 11 ships.

Read More

America Completes Acceptance Trials

America Completes Acceptance Trials

By:
America (LHA-6) returns to Ingalls Shipyard Jan. 31, 2014 from acceptance trials. US Navy Photo

America (LHA-6) returns to Ingalls Shipyard Jan. 31, 2014 from acceptance trials. US Navy Photo

The first in a new class of amphibious warship has completed its acceptance trials, Naval Sea Systems Command (NAVSEA) announced this week. Read More

Amphib America Completes Builders Trials

Amphib America Completes Builders Trials

By:
America (LHA-6). HII Photo

America (LHA-6). HII Photo

The first of the Navy’s next-generation of amphibious warships has completed its builder’s trials, Naval Sea Systems Command (NAVSEA) announced on Thursday.

America (LHA-6) conducted five days of trials in the Gulf of Mexico before returning to Ingalls Shipbuilding in Pascagoula, Miss. Read More

Navy Christens First Block III Virginia Attack Boat

Navy Christens First Block III Virginia Attack Boat

By:
North Dakota (SSN 784) sits moored at the graving dock of General Dynamics Electric Boat prior to its christening ceremony in Groton, Conn. on Nov. 2, 2013. US Navy Photo

North Dakota (SSN 784) sits moored at the graving dock of General Dynamics Electric Boat prior to its christening ceremony in Groton, Conn. on Nov. 2, 2013. US Navy Photo

The Navy has christened the service’s eleventh Virginia-class nuclear attack submarine in a Saturday ceremony in Groton, Conn., according to the service. Read More

Report: Construction Contract for Second Ford Carrier Could be Delayed a Year

Report: Construction Contract for Second Ford Carrier Could be Delayed a Year

By:
Photo illustration of the Ford-class aircraft carrier, USS John F. Kennedy (CVN-79). US Navy Photo

Photo illustration of the Ford-class aircraft carrier, USS John F. Kennedy (CVN-79). US Navy Photo

The Navy is delaying awarding a $4 billion contract to start the second Gerald R. Ford-class nuclear carrier (CVN-78) for up to a year, according to a Friday report from Bloomberg News.

The detailed design and construction for John F. Kennedy (CVN-79) was supposed to be awarded to shipbuilder Huntington Ingalls Industries in September, according to the Bloomberg report. Read More