Tag Archives: Sean Stackley

Navy Revising Force Structure Assessment In Light Of Increased Attack Sub, Other Ship Needs

Navy Revising Force Structure Assessment In Light Of Increased Attack Sub, Other Ship Needs

The Virginia-class attack submarine North Dakota (SSN-784) is rolled out of an indoor shipyard facility at General Dynamics Electric Boat in Groton, Conn., in Sept. 2013. US Navy photo.

The Virginia-class attack submarine North Dakota (SSN-784) is rolled out of an indoor shipyard facility at General Dynamics Electric Boat in Groton, Conn., in Sept. 2013. US Navy photo.

WASHINGTON, D.C. –The Navy will reexamine the assumptions behind its 308-ship requirement, as the operational landscape has changed drastically since the previous Force Structure Assessment (FSA). Read More

Stackley: Funding Levels Creating Risk In U.S. Navy Attack Submarine, Surface Combatant Fleets

Stackley: Funding Levels Creating Risk In U.S. Navy Attack Submarine, Surface Combatant Fleets

Assistant Secretary of the Navy Research, Development and Acquisition Sean J. Stackley visits Naval Surface Warfare Center Indian Head, Md. US Navy Photo

Assistant Secretary of the Navy Research, Development and Acquisition Sean J. Stackley visits Naval Surface Warfare Center Indian Head, Md. US Navy Photo

The Navy is doing “the best we can do for the dollars we have” but has developed its attack submarine acquisition plan, cruiser modernization plan and Littoral Combat Ship/frigate downselect plan based on funding shortfalls rather than strategic needs, Navy acquisition chief Sean Stackley told the House Armed Services seapower and projection forces subcommittee. Read More

Sean Stackley Asks Congress for More Department of Navy Flexibility in Acquisition

Sean Stackley Asks Congress for More Department of Navy Flexibility in Acquisition

Sean Stackley testifies during a Oct. 1, 2015 hearing. CSPAN Image

Sean Stackley testifies during a Oct. 1, 2015 hearing. CSPAN Image

The sea services can “make mountains move” when confronting anti-ship missiles or torpedo threats to aircraft carriers, but what the Department of the Navy wants from Congress “is the ability to take those risks” in experimenting and prototyping more quickly to meet emerging needs, the Navy’s top acquisition official told the House Armed Services Committee Thursday. Read More

F/A-18 Depots See 40-Percent Increase In Productivity After Adapting New Work Model

F/A-18 Depots See 40-Percent Increase In Productivity After Adapting New Work Model

Sailors perform maintenance on an F/A-18C Hornet from the Romans of Strike Fighter Squadron (VFA) 106 on the flight deck of the aircraft carrier USS George H.W. Bush in April 2013. US Navy photo.

Sailors perform maintenance on an F/A-18C Hornet from the Romans of Strike Fighter Squadron (VFA) 106 on the flight deck of the aircraft carrier USS George H.W. Bush in April 2013. US Navy photo.

The Navy’s aviation depots have seen a 40-percent increase in fighter jet throughput since they changed how to approach repairing the legacy F/A-18C Hornets a year ago, the Navy’s director of air warfare told the House Armed Services Committee on Tuesday. Read More

Navy Issues RFP for Oilers and LHA-8 to NASSCO, Ingalls

Navy Issues RFP for Oilers and LHA-8 to NASSCO, Ingalls

Military Sealift Command fleet replenishment oiler USNS Rappahannock (T-AO 204) prior to a replenishment-at-sea on June 29, 2015. US Navy Photo

Military Sealift Command fleet replenishment oiler USNS Rappahannock (T-AO 204) prior to a replenishment-at-sea on June 29, 2015. US Navy Photo

The Navy has issued a request for proposal (RFP) directly to General Dynamics NASSCO and Huntington Ingalls Industries for the third America-class big deck amphibious warship and six next-generation oilers (TAO(X)), the service told USNI News. Read More

Stackley: NASSCO Will Be ‘In Peril’ Absent New Contracts

Stackley: NASSCO Will Be ‘In Peril’ Absent New Contracts

The first Mobile Landing Platform at the General Dynamics NASSCO shipyard in San Diego, Calif. NASSCO Photo

The first Mobile Landing Platform at the General Dynamics NASSCO shipyard in San Diego, Calif. NASSCO Photo

WASHINGTON, D.C. — The California shipyard the U.S. Navy relies on to build its auxiliary ships and some potential future amphibious warships is “one contract away,” from “peril,” the Navy’s top shipbuilder told a Senate panel on Wednesday. Read More

Stackley: Fleet Needs More BMD Ships to Meet Demand

Stackley: Fleet Needs More BMD Ships to Meet Demand

Aegis-class destroyer USS Hopper (DDG-70) launches a standard missile (SM) 3 Blk IA during a 2009 exercise. US Navy Photo

Aegis-class destroyer USS Hopper (DDG-70) launches a standard missile (SM) 3 Blk IA during a 2009 exercise. US Navy Photo

CRYSTAL CITY, Va. — The Navy’s acquisition chief stressed the importance of modernizing ships in the fleet – particularly the ballistic missile defense (BMD) fleet – to keep them operating for their full service life, even as tight budgets are forcing the Navy not to upgrade five Aegis guided missile destroyers with a BMD capability over the next five years. Read More

Navy to Build CVN-79 in 2 Phases; Ditching Plans for Early AFSB-3 Procurement

Navy to Build CVN-79 in 2 Phases; Ditching Plans for Early AFSB-3 Procurement

A unit for the future aircraft carrier John F. Kennedy (CVN-79) rests on the assembly platen at Newport News Shipbuilding on March 5, 2014. US Navy Photo

A unit for the future aircraft carrier John F. Kennedy (CVN-79) rests on the assembly platen at Newport News Shipbuilding on March 5, 2014. US Navy Photo

In their first budget hearing of the year with the House Armed Services Committee (HASC), Navy officials described their Fiscal Year 2016 plans that include speeding up construction of the aircraft carrier USS John F. Kennedy (CVN-79) without changing its delivery date, hurrying to start the USS George Washington (CVN-73) Refueling and Complex Overhaul (RCOH) planning to avoid problems down the road, and abandoning hopes of procuring a third Afloat Forward Staging Base early. Read More