Tag Archives: San Antonio-class

Huntington Ingalls Awaiting Commitment from Navy Before Ramping Up Workforce

Huntington Ingalls Awaiting Commitment from Navy Before Ramping Up Workforce

Newport News Shipbuilding placed a 900-ton superlift into dry dock, continuing construction of the nuclear-powered aircraft carrier John F. Kennedy (CVN 79). Nearly 90 lifts have been placed in the dock and joined together since the ship’s keel was laid in August 2015. Newport News Shipbuilding photo.

Newport News Shipbuilding placed a 900-ton superlift into dry dock, continuing construction of the nuclear-powered aircraft carrier John F. Kennedy (CVN 79). Nearly 90 lifts have been placed in the dock and joined together since the ship’s keel was laid in August 2015. Newport News Shipbuilding photo.

SAN DIEGO, Calif. – The Navy and many lawmakers want a massive increase in Navy spending but haven’t yet put forward a plan to start ramping up spending – and one shipbuilding executive said he wouldn’t feel comfortable investing in a larger workforce until certain signs of Navy commitment appear in the budget. Read More

Navy to Impose More Rigorous Oversight in New Ship Classes; Will Hire More Engineers

Navy to Impose More Rigorous Oversight in New Ship Classes; Will Hire More Engineers

USS Zumwalt (DDG-1000) steams in formation with USS Independence (LCS-2) on Dec. 8, 2016. US Navy Photo

USS Zumwalt (DDG-1000) steams in formation with USS Independence (LCS-2) on Dec. 8, 2016. US Navy Photo

The Navy will need a larger engineering directorate as it grows the fleet in coming years, to avoid problems faced in past ship classes like the Littoral Combat Ship and the Zumwalt guided missile destroyer stemming from the Navy being too hands-off on technical specifications. Read More

Lawmakers ask for Hypothetical Budgets to Build a 355 Ship Navy

Lawmakers ask for Hypothetical Budgets to Build a 355 Ship Navy

Aircraft carrier Gerald R. Ford (CVN-78) sits pier side in the early morning light at Newport News Shipbuilding in 2014. US Navy Photo

Aircraft carrier Gerald R. Ford (CVN-78) sits pier side in the early morning light at Newport News Shipbuilding in 2014. US Navy Photo

WASHINGTON, D.C. — Lawmakers have asked the Congressional Budget Office for data on what it would take to reach a 355-ship Navy over various periods of time, the chairman of the House Armed Services seapower and projection forces subcommittee said today. Read More

N95: Navy, Industry Ready To Ramp Up Amphib Construction If Administration, Congress Provide Money

N95: Navy, Industry Ready To Ramp Up Amphib Construction If Administration, Congress Provide Money

Ingalls Shipbuilding lands the 700-ton deckhouse on the amphibious assault ship Tripoli (LHA 7) on July 9, 2016. Ingalls Shipbuilding photo.

Ingalls Shipbuilding lands the 700-ton deckhouse on the amphibious assault ship Tripoli (LHA 7) on July 9, 2016. Ingalls Shipbuilding photo.

THE PENTAGON – The Navy and industry could act quickly to ramp up amphibious warship production if the Congress and new administration support the Navy’s new call for 38 amphibs, the director of expeditionary warfare (OPNAV N95) told USNI News. Read More

Navy, Marine Corps Considering Adding Vertical Launch System to San Antonio Amphibs

Navy, Marine Corps Considering Adding Vertical Launch System to San Antonio Amphibs

2003 Artist's concept of the San Antonio Class amphibious transport dock ships firing a missile from a vertical launch system in the ship's bow. US Navy Image

2003 Artist’s concept of the San Antonio Class amphibious transport dock ships firing a missile from a vertical launch system in the ship’s bow. US Navy Image

PORTSMOUTH, Va. — The Navy and the Marine Corps are studying installing a vertical launch system in its San Antonio class of amphibious warships that would allow the ships to field larger offensive missiles, service officials told USNI News this week. Read More

UPDATED: HASC Proposes $20.6B In Shipbuilding, 4-Year Carrier Builds, Possible LPD-29

UPDATED: HASC Proposes $20.6B In Shipbuilding, 4-Year Carrier Builds, Possible LPD-29

Aircraft carrier Gerald R. Ford (CVN-78) sits pier side in the erly morning light at Newport News Shipbuilding in 2014. US Navy Photo

Aircraft carrier Gerald R. Ford (CVN-78) sits pier side in the early morning light at Newport News Shipbuilding in 2014. US Navy Photo

The House Armed Services authorizes $20.6 billion in spending for Navy shipbuilding programs, prohibits the inactivation of cruisers as part of the Navy’s proposed phased modernization plan, and calls for the Navy to build aircraft carriers in four-year periods instead of five, according to its version of the Fiscal Year 2017 National Defense Authorization Act, released today. Read More

Navy Could Accelerate LX(R) to 2019 Start, Industry's 2018 Request Not Feasible

Navy Could Accelerate LX(R) to 2019 Start, Industry’s 2018 Request Not Feasible

San Antonio-class amphib Portland launches at Ingalss Shipbuilding on Saturday. HII Photo

San Antonio-class amphib Portland launches at Ingalls Shipbuilding on Saturday. HII Photo

WASHINGTON, D.C. – The Navy could pull the first LX(R) dock landing ship replacement up a year, from Fiscal Year 2020 to 2019, to address vendor needs, but it could not buy the ship in 2018 as an industrial base coalition has requested, the service’s acquisition chief said Wednesday in a Senate Armed Services Committee hearing. Read More