Tag Archives: Naval Sea Systems Command

USNI News Video: Sailors Talk First USS Gerald R. Ford Trap, Launch

USNI News Video: Sailors Talk First USS Gerald R. Ford Trap, Launch

F/A-18F Pilot Lt. Cmdr. Jamie ‘Coach’ Struck makes the first carrier arrested landing using new AAG system aboard USS Gerald R. Ford (CVN-78) on July 28, 2017. US Navy Photo

ABOARD USS GERALD R. FORD — On Aug. 1, 2017, USNI News spoke with sailors who manned Ford’s next-generation Advanced Arresting Gear and Electromagnetic Aircraft Launch System (EMALS) for the first trap and catapult from the $13 billion carrier’s flight deck. Read More

Trump: Carrier USS Gerald R. Ford ‘100,000-ton Message to the World’

Trump: Carrier USS Gerald R. Ford ‘100,000-ton Message to the World’

MV-22 Ospreys assigned to the U.S. Presidential Helicopter Squadron land on the flight deck of the aircraft carrier USS Gerald R. Ford (CVN-78) during the ship’s commissioning ceremony at Naval Station Norfolk, Va. on July 22, 2017. US Navy Photo

President Donald Trump made a case for continued American military dominance and congressional support for his pending defense budget against the backdrop of the entrance of the world’s largest warship into service on Saturday. Read More

Interview: NAVSEA 'Headed in the Right Direction' After Years of Maintenance Backlogs

Interview: NAVSEA ‘Headed in the Right Direction’ After Years of Maintenance Backlogs

Dry Dock 1 at Pearl Harbor Naval Shipyard is flooded during the undocking of the Los Angeles-class fast attack submarine USS City of Corpus Christi (SSN 705) on May 18, 2010. US Navy photo.

This post has been updated to correct which aircraft carrier is set for an upcoming docking availability.

WASHINGTON NAVY YARD — The Navy has faced massive backlogs of submarine and aircraft carrier maintenance work at its four public shipyards in recent years, at times pushing nearly ten percent of its workload into the next year.

But if 2017 was the year that bow wave of deferred maintenance caught the attention of lawmakers, it was also the year the Navy made great strides in addressing the problem – despite having a ten percent higher than average workload this year, the yards will end the year with about a quarter of the maintenance backlog they began the year with, the Naval Sea Systems Command commander Vice Adm. Tom Moore told USNI News. Read More

Navy Planning Public Shipyard Overhauls To Boost Efficiency, Replacing Aging Drydocks

Navy Planning Public Shipyard Overhauls To Boost Efficiency, Replacing Aging Drydocks

Aircraft carrier USS Harry S. Truman (CVN 75) transits the Elizabeth river from its homeport at Naval Station Norfolk to Norfolk Naval Shipyard in August 2016. US Navy photo.

The Navy is planning a multi-billion-dollar shipyard upgrade effort to help its four yards that maintain submarines and aircraft carriers do so more efficiently and accommodate the newest ships coming into the fleet. Read More

NAVSEA: Extending Surface Ship Service Lives Could Speed Up 355-Ship Buildup By 10-15 Years

NAVSEA: Extending Surface Ship Service Lives Could Speed Up 355-Ship Buildup By 10-15 Years

The littoral combat ship USS Montgomery (LCS 8) enters dry dock for Post Shakedown Availability (PSA) at San Diego Ship Repair on May 19, 2017. US Navy photo.

The Navy could reach a 355-ship fleet 10 to 15 years faster than current plans allow if it extended the service life of today’s surface ships by five or 10 years each, effectively cutting in half the time it would take to complete the fleet buildup, the commander of Naval Sea Systems Command said today. Read More

Attack Sub USS Boise Set for Private Yard Maintenance in 2019 After Public Yard Backlog Defers Job

Attack Sub USS Boise Set for Private Yard Maintenance in 2019 After Public Yard Backlog Defers Job

The Los Angeles-class attack submarine USS Boise (SSN 764) enters Souda Bay, Greece, during a scheduled port visit on Dec. 23, 2014. US Navy photo.

Last week’s 2018 budget request lays the groundwork to get attack submarine USS Boise (SSN-764) into an overdue maintenance availability in 2019, with a private shipyard taking over the maintenance effort to get the sub out of its two-year holding pattern. Read More