Tag Archives: Landing Craft Air Cushion

Pentagon: $11B In Modernization Cut From FY2017 Request To Comply With Budget Agreement

Pentagon: $11B In Modernization Cut From FY2017 Request To Comply With Budget Agreement

Among the last-minute cuts made in the Fiscal Year 2017 budget request were four service life extension programs for LCACs, above, and 77 Joint Light Tactical Vehicles to replace the Humvee, also above. US Navy photo.

Among the last-minute cuts made in the Fiscal Year 2017 budget request were four service life extension programs for LCACs, above, and 77 Joint Light Tactical Vehicles to replace the Humvee, also above. US Navy photo.

The Defense Department made cuts from several big acquisition programs out of necessity, with a pair of decisions affecting the Pentagon’s Fiscal Year 2017 budget request coming in the months and weeks before the request was due, the DoD comptroller told reporters on Tuesday. Read More

Textron: Ship-to-Shore Connector Will Be Simpler To Operate, More Maintainable Than Current LCACs

Textron: Ship-to-Shore Connector Will Be Simpler To Operate, More Maintainable Than Current LCACs

Textron Marine and Land Systems' Louisiana production facility features automated welding and other innovations that will speed up Ship to Shore Production compared to the legacy LCACs. Textron photo.

Textron Marine and Land Systems’ Louisiana production facility features automated welding and other innovations that will speed up Ship to Shore Production compared to the legacy LCACs. Textron photo.

The Navy’s next generation of surface connectors will be more reliable and less costly to operate after the Navy designed out the top 25 maintenance drivers from the legacy craft, according to surface connector manufacturer Textron Marine and Land Systems. Read More

LCU Replacement in Preliminary Design, Anticipating 2022 Fleet Debut

LCU Replacement in Preliminary Design, Anticipating 2022 Fleet Debut

Marines aboard Landing Craft Utility (LCU) 1655 approach the well deck of the amphibious assault ship USS Bataan (LHD-5) on Aug. 22, 2014. US Navy Photo

Marines aboard Landing Craft Utility (LCU) 1655 approach the well deck of the amphibious assault ship USS Bataan (LHD-5) on Aug. 22, 2014. US Navy Photo

The Navy is doing preliminary design work on its Landing Craft Utility (LCU) replacement now to begin construction within about three years, in time to support one-for-one replacement on the surface connectors in 2022. Read More

Navy Further Extending Life of Already-Extended LCACs Until Replacement Delivers in 2017

Navy Further Extending Life of Already-Extended LCACs Until Replacement Delivers in 2017

A landing craft air cushion (LCAC) assigned to Amphibious Craft Unit (ACU) 4 approaches shore to perform a beach landing on Oct. 25, 2013. US Navy Photo

A landing craft air cushion (LCAC) assigned to Amphibious Craft Unit (ACU) 4 approaches shore to perform a beach landing on Oct. 25, 2013. US Navy PhotoLCAC

NATIONAL HARBOR, Md. – The Navy is further extending the life of Landing Craft Air Cushions (LCACs) that have already gone through their Service Life Extension Programs (SLEPs), with the oldest craft set for retirement this year and the replacement not ready for its first delivery until 2017. Read More