Tag Archives: Ford-class carrier

Navy Tackling Ford-Class Weapons Elevator Challenges; Decision on 2-Carrier Buy Still Pending

Navy Tackling Ford-Class Weapons Elevator Challenges; Decision on 2-Carrier Buy Still Pending

F/A-18F Pilot LCDR Jamie R. Struck the makes first carrier arrested landing using AAG system aboard USS Gerald R. Ford (CVN-78) off the Virginia coast. US Navy Photo

CAPITOL HILL – The Navy’s acquisition chief said the weapons elevators on USS Gerald R. Ford (CVN-78) will be built and installed by the time the ship comes out of its ongoing post-shakedown availability, but he may launch an independent review team to look at the long-term sustainability and reliability of the elevators. Read More

Navy Will Release New 30-Year Ship Repair, Modernization Plan with Annual Shipbuilding Report

Navy Will Release New 30-Year Ship Repair, Modernization Plan with Annual Shipbuilding Report

USS Mesa Verde (LPD-19) being placed into the dry-dock on May 1, 2018. US Navy Photo

WASHINGTON, D.C. — The Navy will release a 30-year ship repair and modernization plan alongside its 30-year shipbuilding plan next spring, to help the maintenance industry plan its workforce and infrastructure investments with the same confidence that yards on the new-construction side can, the Navy’s acquisition chief said today. Read More

Senators Want More Details on 2-Carrier Buy, LCS Requirement Before Supporting Additional Shipbuilding Funds

Senators Want More Details on 2-Carrier Buy, LCS Requirement Before Supporting Additional Shipbuilding Funds

A crane moves the lower stern into place on the nuclear-powered aircraft carrier John F. Kennedy (CVN-79) at Huntington Ingalls Shipbuilding in Newport News, Va. on June 22, 2017. HII Photo

The Senate Armed Services Committee is looking for more information from the Navy before it will support buying additional ships in Fiscal Year 2019, which its House counterparts wholeheartedly endorsed doing. Read More

2019 NDAA Amendments Question Carrier Long-Range Strike, Future of ASW Helos

2019 NDAA Amendments Question Carrier Long-Range Strike, Future of ASW Helos

An MH-60R Sea Hawk helicopter assigned to the “Blue Hawks” of Helicopter Maritime Strike Squadron (HSM) 78 participates in a change of command ceremony near the Nimitz-class aircraft carrier USS Carl Vinson (CVN-70) on Jan. 15, 2018. US Navy Photo

The House Armed Services Committee added to its annual defense bill provisions allowing the military to buy more F-35 Lighting II Joint Strike Fighters if the program could achieve sufficient cost-savings, addressing the health and future of the MH-60R anti-submarine warfare helicopter, encouraging the Navy to continue buying aircraft carriers every three years, and more. Read More

Top Stories 2017: U.S. Navy Acquisition and Maintenance

Top Stories 2017: U.S. Navy Acquisition and Maintenance

USNI News polled its writers, naval analysts and service members on what they consider the most important military and maritime stories in 2017.

The following is part of a series. Please also see Top Stories: International AcquisitionNavy OperationsMarine Corps OperationsMarine Corps and Coast Guard AcquisitionInternational Operations and New Administration

2017 began with the promise of planning for a larger fleet: at the end of 2016, the Navy announced a 355-ship requirement, and the incoming Trump Administration expressed its support for a larger military and a heftier Navy. Few concrete steps were taken this year, though, to begin a buildup – though many programs that will be pivotal to the 355-ship fleet of the future reached significant programmatic milestones in 2017. 

Read More

CVN-80 Eyed For Accelerated Contracting Pilot Program, Potential 2-Carrier Buy

CVN-80 Eyed For Accelerated Contracting Pilot Program, Potential 2-Carrier Buy

Newport News Shipbuilding cut a 35-ton steel plate to kick off advance construction of the aircraft carrier Enterprise (CVN 80) on Aug. 24, 2017. Ship’s sponsors and U.S. Olympic gold medalists Simone Biles (left) and Katie Ledecky (center), along with Newport News Shipbuilding President Jennifer Boykin (right), signed the steel that will become part of Enterprise’s foundation. Newport News Shipbuilding photo.

The upcoming contract award for the future aircraft carrier Enterprise (CVN-80) will be part of a Defense Department pilot program to award major contracts faster, and Navy leadership is eyeing it as an opportunity to save money by buying two carriers instead of one. Read More

House Armed Services Committee Debates Hypoxia, LCS Buys, CVN-78 Shock Trials, Flight III Upgrade Schedule

House Armed Services Committee Debates Hypoxia, LCS Buys, CVN-78 Shock Trials, Flight III Upgrade Schedule

The House Armed Services Committee passed its annual defense bill on Thursday after a 14-hour markup, sending the bill to the full House of Representatives with no major changes to its recommended procurement profile.

Though few amendments that passed directly affect Navy and Marine Corps programs, several that failed or were withdrawn sparked serious debates about how the Navy ought to address pressing issues of the day: hypoxia concerns in the Navy’s fighter fleet, how to transition from the Littoral Combat Ship, industry’s ability to upgrade to the Flight III guided-missile destroyer design and more. Read More

Navy Planning Public Shipyard Overhauls To Boost Efficiency, Replacing Aging Drydocks

Navy Planning Public Shipyard Overhauls To Boost Efficiency, Replacing Aging Drydocks

Aircraft carrier USS Harry S. Truman (CVN 75) transits the Elizabeth river from its homeport at Naval Station Norfolk to Norfolk Naval Shipyard in August 2016. US Navy photo.

The Navy is planning a multi-billion-dollar shipyard upgrade effort to help its four yards that maintain submarines and aircraft carriers do so more efficiently and accommodate the newest ships coming into the fleet. Read More