Tag Archives: Columbia class

Navy Considering Mid-Block Virginia-Class Upgrades, SSGN Construction in Late 2030s

Navy Considering Mid-Block Virginia-Class Upgrades, SSGN Construction in Late 2030s

The Virginia-class attack submarine USS North Dakota (SSN-784) arrives at the Trident Refit Facility’s Magnetic Silencing Facility (MSF) in August 2017. US Navy photo.

The Navy has developed a Tactical Submarine Evolution Plan that looks at rapidly inserting capability upgrades into the Virginia-class attack submarine mid-contract and considers long-term undersea warfare priorities such as converting the Columbia-class ballistic missile submarine (SSBN) production line into a guided-missile submarine (SSGN) line in the late 2030s. Read More

Top Navy Procurement Programs Facing Slow Start In FY 2018 Due to Continuing Resolution

Top Navy Procurement Programs Facing Slow Start In FY 2018 Due to Continuing Resolution

A crane moves the lower stern into place on the nuclear-powered aircraft carrier John F. Kennedy (CVN-79) at Huntington Ingalls Shipbuilding in Newport News, Va. on June 22, 2017. HII Photo

The Navy is unable to start or ramp up a range of major programs under a continuing resolution, and Pentagon officials are urging the quick passage of a full FY 2018 budget. Read More

Navy Report: Submarine Industrial Base Can Maintain 2-Attack Boat Construction Rate, Bolstering Lawmakers' Plans

Navy Report: Submarine Industrial Base Can Maintain 2-Attack Boat Construction Rate, Bolstering Lawmakers’ Plans

The Virginia-class attack submarine Pre-commissioning unit John Warner (SSN 785) is moved to Newport News Shipbuilding’s floating dry dock on Sept. 1, 2014. Huntington Ingalls Industries photo.

The Navy has confirmed that its submarine industrial base can continue building two Virginia-class attack submarines a year even while adding the Columbia-class ballistic-missile submarine to its workload, giving a key congressman confidence in the House’s plan to boost submarine procurement in the coming years. Read More

House Armed Services Committee Looking At 25-30 Year Pace For Reaching 355 Ship Navy

House Armed Services Committee Looking At 25-30 Year Pace For Reaching 355 Ship Navy

Newport News Shipbuilding placed a 900-ton superlift into dry dock, continuing construction of the nuclear-powered aircraft carrier John F. Kennedy (CVN 79). Nearly 90 lifts have been placed in the dock and joined together since the ship’s keel was laid in August 2015. Newport News Shipbuilding photo.

WASHINGTON, D.C. — The chairman of the House Armed Services seapower and projection forces subcommittee believes the Navy can reach a 355-ship fleet in the 25- to 30-year timeframe, given industrial base capacity and expected funding levels. Read More

House Seapower Chair Wittman Outlines Committee Agenda

House Seapower Chair Wittman Outlines Committee Agenda

Rep. Rob Wittman (R-Va.)

WASHINGTON, D.C. — The new head of the Hose Armed Services seapower and projection forces committee presented an outline of his priorities including moving aircraft carriers to four-year build cycles, funding ships incrementally and learning how fast the shipbuilding industry can ramp up to meet the Navy’s 355 ship goal. Read More